Repository navigation
DCO-2 / DCO
succeeded
Oct 15, 2026 in 0s
Check passed!
All commits are signed off, the check passed.
Summary
| Sha | Message | Pass or fail reason | |
|---|---|---|---|
| 🟢 | e62bfab | install: Add /var and /etc migration options | Valid sign-off found |
| 🟢 | d638a13 | install: Optimize /var migration across directory ... | Valid sign-off found |
| 🟢 | 074d241 | tmt: Add single-guest package-mode migration test | Valid sign-off found |
| 🟢 | f00fef7 | install: Skip nested mounts during var migration | Valid sign-off found |
| 🟢 | e14890d | install: Reopen O_PATH dirs for var metadata | Valid sign-off found |
Loading