Skip to content

chore: update managed dependency versions - #207

Open
SkylineCICD wants to merge 1 commit into
mainfrom
automation/update-managed-dependency-versions
Open

SkylineCICD wants to merge 1 commit into
mainfrom
automation/update-managed-dependency-versions

Conversation

@SkylineCICD

Copy link
Copy Markdown
Contributor

This PR was created automatically by the Update managed dependency versions workflow.

Package Current Latest stable
Skyline.DataMiner.Core.AppPackageInstaller 4.4.0 4.5.0
Skyline.DataMiner.Sdk 2.7.1 2.8.0

Prerelease and unlisted NuGet versions are excluded. Merging this PR rolls the selected versions out through the reusable workflow.

@MichielOda

This comment has been minimized.

@MichielOda

Copy link
Copy Markdown
Member

/prepare-downstream-fixes

SkylineCommunications/BOOST-DailyRegression-InternalNuGet

  • In pr-ci-cd-oidc.yml, retry the tag-only Push NuGet Packages job lookup for a bounded time when the job is missing or its conclusion is null. Require success; fail on a terminal non-success result or timeout. Keep the NuGet artifact assertion.

SkylineCommunications/BOOST-DailyRegression-Skyline.DataMiner.Sdk

  • In pr-ci-cd.yml, retry the tag-only Upload to Catalog job lookup for a bounded time when the job is missing or its conclusion is null. Require success; fail on a terminal non-success result or timeout. Keep the DataMiner package artifact assertion.

SkylineCommunications/BOOST-DailyRegression-SharedLibrary

  • In pr-ci-cd.yml, retry the tag-only Upload to Catalog job lookup for a bounded time when the job is missing or its conclusion is null. Require success; fail on a terminal non-success result or timeout. Keep the signing deduplication and artifact assertions.

SkylineCommunications/BOOST-DailyRegression-MasterWorkflow

  • In pr-mixed.yml, retry the Discover Project Types and Package & Sign (Windows) job lookups for a bounded time when either job is missing or its conclusion is null. Require both to succeed; fail on a terminal non-success result or timeout. Keep all three artifact and package-content assertions.

@github-actions

Copy link
Copy Markdown

Downstream fix preparation for 444c1cd6a1448761c05fc906e12866424a34cb51

Each Copilot assignment runs independently in its downstream repository. Review and merge the resulting pull requests separately.

@MichielOda

This comment has been minimized.

2 similar comments
@MichielOda

This comment has been minimized.

@MichielOda

This comment has been minimized.

@github-actions

Copy link
Copy Markdown

❌ Some downstream tests failed — comment /retest to re-run only the failed repos.

PR #207 (444c1cd)

Repository Status Link
SkylineCommunications/BOOST-DailyRegression-InternalNuGet ✅ success (previous battery) -
SkylineCommunications/BOOST-DailyRegression-NegativePaths ✅ success (previous battery) -
SkylineCommunications/BOOST-DailyRegression-SharedLibrary ✅ success (previous battery) -
SkylineCommunications/BOOST-DailyRegression-Skyline.DataMiner.Sdk ✅ success (previous battery) -
SkylineCommunications/BOOST-DailyRegression-MasterWorkflow ❌ failure View run

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants