Skip to content

Init Repo Scaffolding & CI Validation #4

Description

@AccessiT3ch

Linked to Epic

Overview

Executive Fleet / CI Monitor: The init repo scaffolding is complete from Phase 0a. This issue tracks Phase 1 validation: ensuring CI is stable, toolchain is ready, and no regressions block downstream Python Wizard features.

Acceptance Criteria

  1. CI/CD pipeline: All GitHub Actions workflows passing consistently on main
    • Lint workflow green (ruff, mypy if applicable)
    • Test workflow green (pytest, >80% coverage)
    • Build/deploy workflow validated
  2. Toolchain validated:
    • uv sync succeeds cold-start (from scratch)
    • All development dependencies resolving without conflicts
    • Pre-commit hooks (if present) running cleanly
  3. No known breaking issues preventing Python Wizard feature development
  4. Documentation:
    • README.md complete with contributor setup instructions
    • CONTRIBUTING.md in place (or link to dogma)
  5. Repo health:
    • GitHub community standards checklist passing (verified via gh repo view)
    • No critical security alerts

Scope Notes

  • This issue validates Phase 0a work, not new feature development
  • Blockers: Any failed CI or missing toolchain items should be escalated with detail
  • Downstream: Unblocks #101–102 (Python Wizard features)

Effort

~5 hours (validation + doc review, minimal new code)

Activity

Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Metadata

Metadata

Assignees

Type

No type

Projects

No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions