Skip to content

Latest commit

 

History

2 Commits

Folders and files

NameName
Last commit message
Last commit date
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Repository files navigation

Unitcommit

Do the power numbers add up?

The cabinet factor is applied first. This check then compares the power used with the power asked. A mismatch is refused. A plan of on and off is not a dispatch by itself, and the width of that plan has to match the problem.

It takes the charger group from Loadclear and the factor from Cabinetfield, as plain values. Phasepin grades the clock after a pass. The plan is described in docs/ISING-HAMILTONIAN.md.

It does not call a quantum computer, and it does not sign the record.

Copyright 2026 DIGITAL CURRENSY INC / Module Kinetic Ltd. Apache-2.0. See LICENSE. Parent: module-kinetic-ltd

Tests

python -m pip install pytest
PYTHONPATH=. python -m pytest

About

Do the power numbers add up? A mismatch is refused.

Topics

Resources

Stars

2 stars

Watchers

0 watching

Forks

Releases

Packages

Contributors

Languages